• Client: Kier Utilities & Highways
  • Project: Kier Utilities & Highways
  • Sector: Commercial, Construction, Energy, Environmental, Healthcare, Housebuilding, Infrastructure, Manufacturing, Rail & Transport, Utilities
  • Services: Waste Classification Testing

1w

Project
Duration

100

Tonnes
Removed

100%

Diversion

£650k

Total
Savings

Project Highlights

The works is an emergency utility project which needs to excavate below the road to carry out repairs and remove the waste for disposal. The intention had been to remove the waste under RPS211 until Ecofficiency checked the scope and the project didn’t qualify for this position statement as the quantity of waste exceeded 10m3. However, the project needed to be completed within the week which didn’t allow for time for lab tests.

Project Management

A pre-phase sampling plan was prepared by Ecofficiency to identify the sample locations prior to attending site.

Once complete, Ecofficieny mobilised to site to conduct RMT analysis of the waste for hydrocarbons and metals to check the classification prior to removal from site to ensure the removals were compliant with WM3.

The Results

It was identified on Friday evening that analysis needed to be carried out, Ecofficiency mobilised to site on Monday and the test results were published before the end of the day on Monday. This then allowed for the waste removals to commence on Tuesday with all waste removed within the one day, allowing the total volume to be removed ahead of schedule, allowing the client to complete their works without delays.

By using Ecofficiency’s RMT classification of soils service, we were able to avoid landfill, which fell in line with the clients targets of landfill diversion.

Share

Start your project with us today!

    Name

    Email

    Telephone

    More Case Study Images

    We’ve worked with Ecofficiency now for two years and in that time they’ve played a vital part in helping to reduce waste output at our developments by 45%. This is a fantastic result and we are proactively working with Ecofficiency on further recycling initiatives”.
    Neil Howard - Commercial Director

    Similar Case Studies

    HillHouse Sidings

    link

    HillHouse Sidings

    Lavender Hall

    link

    Lavender Hall

    Story Contracting – Leamington Contract

    link

    Story Contracting – Leamington Contract

    Scroll to Top